Follow the steps below to help prepare for your scheduled demolition.
Ensure team have free access to the work area.
Please BE ONSITE when work is to start ensuring adequate job communication with the team on what you require. Please be on site when work is complete to sign off that you are satisfied and make the appropriate payment. If you can not be on site, then make sure the area is clearly marked. Leave a key if needed.
You should be contactable throughout our works, if we encounter any problems, or if we have any questions.
Please advise us on what is the site access? (Stairs, Lift – how many levels)
Is there sufficient parking on-site for a truck or trailer? Any special instructions for access or parking requirements? If parking permits or payments are required this will be at additional cost. All CBD, Highrise and apartments will incur a labour surcharge.
REMOVE ALL FURNITURE & appliances from your floor area & bench tops. All reasonable care will be taken but we will not be liable for damage to any items left in or around the work area.
After flooring removal will depend on the original slab condition before flooring was laid and how hard or soft you slab is. If you have a soft slab there may be holes/grooves and marks from removing your flooring. Any major repairs to sub-floor will require additional charges.
In the process of removing flooring there may be some chips to paint work, skirting boards and kitchen kick-boards around flooring area. All Caution is taken, but some tiles do shatter & may accidentally scratch paint and skirting boards.
All paint touch ups and repairs are the responsibility of the client.
The final condition of a TIMBER SUB-FLOOR after flooring removal depends on: How well the flooring is stuck down and the actual condition of the sub floor. Timber sub floors WILL be damaged and marked by removal nails and glue. All care is taken during the removal process, however marks and scratches to timber sub-floor CAN NOT be avoided in some areas. If sub-floor is pine or chipboard, there may be MAJOR damage and holes to sub-floor as a result of removing directly stuck down flooring. Any repairs required to sub-floor is the responsibility of the client.
Site Power You must have SUFFICIENT POWER connected for our use, or temporary site power available.
Minimal power will inhibit the safe operation of our machinery and delay job completion. If we have problems with insufficient power, waiting charges may apply until power is fixed or a generator supplied (at additional cost).
We can seal and cap off some plumbing fittings, If there is any appliances to be removed? Dishwasher, washing machine, Fridge? Relevant charges will apply. TOILETS (if being kept) should also be removed by a plumber prior to works.
We can seal and cap off some plumbing fittings, If there is any appliances to be removed? Dishwasher, washing machine, Fridge? Relevant charges will apply. TOILETS (if being kept) should also be removed by a plumber prior to works.
Melbourne’s specialist in tight access and partial demolition.